Real-world success stories: discovering sustainable construction solutions

MMC Gamuda KVMRT – A Great RIB CostX Case Study

February 23, 2024
3 mins read

MMC Gamuda KVMRT (T) Sdn Bhd (MGKT) was set up on 30 March 2012 to undertake the design and construction work for the underground package of Klang Valley Mass Rapid Transit (KVMRT) project. The MRT project is part of the Government’s Economic Transformation Programme and owned by the Government of Malaysia through MRT Corporation Sdn Bhd (MRT Corp). With proven track record in carrying out tunnelling and other underground works in the challenging geology of the Klang Valley, MGKT has also won the single-largest Mass Rapid Transit (MRT) package to date worth 15.47bil for the underground works in the recently launched MRT Sungai Buloh-Serdang-Putrajaya (SSP) Line. 

KVMRT SSP Line – Underground Work Package, 13.5km 

Client: Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) 
Product used: CostX 6.5 R1 
Project: KVMRT SSP Line – Underground Work Package, 13.5km underground, 11 underground stations. 
Value: RM 13 Billion 
Timeframe: March 2016 – December 2021 

Client’s Requirements 

Having completed KVMRT Line 1, MRT Corp required a more robust design coordination with better control over discrepancies and constraints to increase productivity and efficiency in the delivery of the SSP Line. MRT Corp implemented BIM Level 2 requirements focusing on the use of common data environment (CDE) hosting all design information managed under a stringent workflow, therefore improving collaboration between project parties. 

MGKT’s contributions 

Our company worked very hard towards achieving certification of BIM Level 2 Prepared Capabilities in August 2019 by the Building Research Establishment (BRE) Global UK. Internally, we use CostX as one of the many tools to communicate costing with design information and internal planning, including updates and revisions. We also tested the potential of running simulated programme and cost projections alongside other construction software. We believe CostX is part of a greater BIM solution in the field of construction delivery. 

Making the Difference 

CostX significantly increases the speed of repetitive quantification works compared to traditional methods. In 3D model interaction, it serves as an effective visualisation tool, particularly important in dissecting components for costing. A defined process within CostX’s model mapping functionality coupled with the use of coordinated / validated information hosted on the projects CDE can then lead to the ability to track changes through the automation of quantification techniques as opposed to a more traditional method of measurement. This solution has proven to produce consistent output whilst maintaining flexible customisation.